加入收藏 | 设为首页 | 会员中心 | 我要投稿 李大同 (https://www.lidatong.com.cn/)- 科技、建站、经验、云计算、5G、大数据,站长网!
当前位置: 首页 > 百科 > 正文

OCP题库变更,052新加的考试题及答案整理-22题

发布时间:2020-12-12 13:29:00 所属栏目:百科 来源:网络整理
导读:22、You are planning a software installation for both Oracle Database 11g Release 1 and Release 2. You plan to have at lease one database for each release managed by Grid Infrastructure for a Standalone Server. Which three are true in this

22、You are planning a software installation for both Oracle Database 11g Release 1 and Release 2.

You plan to have at lease one database for each release managed by Grid Infrastructure for a Standalone Server.

Which three are true in this scenario?

A) Oracle 11g Release 1 databases must be managed by Grid Infrastructure 11g Release 1.

B) Both databases can be managed by Grid Infrastructure 11g Release 2.

C) Both Oracle versions and Grid Infrastructure can be owned by the same O/S account.

D) Gird Infrastructure must be installed before both Oracle Database versions.

E) Each version of the database may be managed by a separate version of Grid Infrastructure.

F) Both Oracle versions and Grid Infrastructure can be installed under the same ORCALE_BASE.

Answer:ADE

(编辑:李大同)

【声明】本站内容均来自网络,其相关言论仅代表作者个人观点,不代表本站立场。若无意侵犯到您的权利,请及时与联系站长删除相关内容!

    推荐文章
      热点阅读